Site Inspections

REDUCE THE RISK OF COSTLY DEFECTS & REWORKS

Stage by stage inspections ensure quality control on site and give peace of mind. Inspections check that contractor workmanship is of an acceptable level and ensure that items which could delay future trades or impact the project financially, are closed out.

The purpose of our inspections is to confirm that the construction is in accordance with Contract Documentation, the Building Act and Regulations, the Building Code of Australia, Australian Standards and the Victorian Building Authority's Guide to Standards and Tolerances.

Our inspections are completed as per AS 4349.0-2007 and highlight items that are not covered by the mandatory inspections carried out by the Building Surveyor.

Generally, the critical times for inspections are;
     1. Site pre-start
     2. Pre-pour
     3. Frame
     4. Pre-plaster
     5. Final handover

Each stage of the build flows on to another important stage so it’s imperative that any issues are identified and rectified when they are visible i.e. not hidden behind concrete or plasterboard, and prior to additional works proceeding, to prevent reworks and variations.

Following each inspection, we provide a detailed report highlighting defects and/or potential issues that could result in costly re-works and delays to the project. Our comprehensive report makes items easily actionable and trackable.
 

BENEFITS:

  • Ensure that the contract and its specifications are complied with
  • Any issues can be rectified prior to additional works proceeding, preventing reworks and variations
  • Save time and minimise project delays and variations
  • Ensure you are satisfied with the quality of the build

 